skip to Main Content

Get In Touch

Cyprus (Head Office)
249 Strovolos Avenue
Strovolos 2049, Nicosia, Cyprus
P.O .Box 27832, Engomi 2433, Cyprus

South Africa
Hydro-Comp Enterprises (SA)(Pty)Ltd
No 3 Eglin Road,
Crescent East Block C,
1st Floor,
Sunninghill 2157
Johannesburg
South Africa

Botswana
No 6A, The Courtyard
P/Bag X21, The Village
Gaborone

Egypt
Villa57, Neighboring 4.District9
Al Shorouk City, Cairo, Egypt

Hydro - comp headquarters location

Menu

Hardware and Networking

In most cases Hydro-Comp will provide specifications and budget costs for all computer hardware and communication requirements and the goods and associated services will be sourced from local specialised companies.

hardware & networking
ERP integration services

ERP Systems

Hydro-Comp works with various reputable ERP system integrators throughout the world, to provide an integrated overall solution where required.

EDAMS Management Systems Implementation

EDAMS Management Systems can be substantially configured and altered to suit the user environment. Customisation, particularly with regard to management reports and forms, is also done as part of the normal system implementation exercise

Formal system implementation and project management methodologies (RSIM) are used to ensure a properly implemented system with minimum disruption and upheaval to the user environment. These methodologies not only provide for the systematic analysis of user requirements and customisation and implementation of the systems, but also address the impact on the environment that surrounds the system (business processes, job descriptions, procedure, organisational structures, etc.) and the entire change management process. Formal, well documented, User & Management Training courses exist. All training is provided both in the English and the local language.

RSIM methodology diagram
project quality assurance plan

Project Quality Assurance

For every project undertaken by Hydro-Comp a Project Quality Assurance Plan (QAP) is designed and put in effect from the commencement of the project.

The purpose of the Project Assurance Plan is to outline the Quality Control (QC) measures to be implemented for activities within the framework of the project. The plan provides the mechanism to ensure that activities affecting quality are recorded within the document control system and are accomplished in accordance with contract specifications and procedures. The Project QAP provides for controls necessary to achieve specified quality. It identifies personnel, procedures and records to be used.

Data Capture Services

For thorough deployment of the EDAMS Management Systems and their effective utilisation in addressing the problems facing the Utility, it is important that appropriate data is available. This may already be in a digital format in many Utilities and in such cases data capture is not necessary. Although EDAMS Management Systems can be used to carry out data capture, it is not necessary to use them, as long as the data is captured in a readable format. Any such data capture can take place prior to the deployment of EDAMS Management Systems. It can also take place after deployment of the systems provided that, during deployment, data from a small area exists or is captured during systems implementation.

data capture screenshot
Back To Top